Commercial works on gas/oil start at appliance input ratings 70kw>, or pipework from 35mm> as long as it contains a total installation volume of less than 0.035m3, a U16 meter can be used depending on overall volume not exceeding 0.035m3.

Generally we will design the installations working with builders/architects in the planning stages.

We offer a full installation and maintenance program with annual planned works.

AHS Heating
Callback Request